Asbestos Hazard Emergency Response Act (AHERA)

In compliance with AHERA, Pine Haven Boys Center is required to notify parents, teachers, and all other building occupants that an Asbestos Management Plan (AMP) is available to them in the office of the school. The AMP details the location of asbestos in each building and provides a record of inspections, re-inspections, periodic surveillance, and removal of asbestos.

Periodic surveillance of Asbestos Containing Building Material (ACBM) is conducted by school personnel every six months and a thorough re-inspection of ACBM is conducted once every three years by Pine Haven’s environmental consultant. The most recent 3-year inspection was conducted in April 2023.

If you require more detailed information, please call Pine Haven office at 485-7141 and staff will direct your inquiry to the school designated person for asbestos information.